First Philec Inc.
First Philec Inc.

Facilities Engineer | Batangas  

First Philec Inc.

 
  • Tanauan, Philippines
    Ulango, Tanauan, Batangas, Philippines
    Tanauan
    Calabarzon
    Philippines
    Philippines
  • Penuh waktuFULL_TIME

Berakhir 7 years ago

2017-06-30T16:00:00+00:00
Ditutup.

Deskripsi Pekerjaan

  • Lead the usual repair and maintenance requirements of the plant's utility systems (e.g. air-conditioning system,lighting system, production equipments) and fire detection & alarm systems/equipment
  • Prepare budgets, purchase requests and bid specifications for the department's supplies and maintenance projects
  • Assist in securing related necessary permits from government units

Kualifikasi Minimum

  • Has a Bachelor's Degree in either Mechanical Engineering or Electrical Engineering
  • Has at least 1 year experience in building maintenance and repair
  • Thorough knowledge on drawing and interpreting electrical diagrams
  • Has background on installing electrical devices, motors, wirings and appliances
  • Has background on interpreting piping/plumbing layouts
  • Has background on fabrication works
  • Knowledge on using electrical tools and test instruments
  • Good written and oral communication skills

Ringkasan Perkerjaan

Tingkat Posisi
Supervisor / Asisten Manager
Spesialisasi
Manufacturing and Production
Persyaratan tingkat pendidikan
Lulus program Sarjana (S1)
Respon rekruter ke lamaran
Once in a while
Alamat Kantor
Ulango, Tanauan, Batangas, Philippines
Industri
Electrical / Electronic Manufacturing
Lowongan
1 lowongan dibuka
Situs
http://www.firstphilec.com

Agar merasa aman saat melamar: carilah ikon verifikasi dan selalu lakukan riset terhadap Perusahaan yang Anda lamar. Hindari dan laporkan situasi dimana Perusahaan membutuhkan bayaran dalam proses rekrutmen mereka.

Tentang First Philec Inc.

First Philippine Electric Corporation (First Philec), a member of the Lopez Group, is the intermediate holding company of First Philippine Holdings Corporation (FPH) primarily for its manufacturing and technology related investments. Through First Philec, FPH intends to grow its investments in manufacturing to provide a more robust backbone to the country’s economy, one that is founded on technological competitiveness and increased ability to add value to products and manufacturing services for the global market. First Philec intends to achieve its growth by building on its core strength in manufacturing operations excellence. Using manufacturing at its core, it aims to engineer innovative industrial solutions. Overview First Philec was officially registered with the Securities and Exchange Commission on July 8, 2004 to serve as an intermediate holding company for all manufacturing investments of its parent company, FPH. FPH is one of the Philippines’ largest conglomerates with businesses in power generation, power distribution, real estate, and construction. It belongs to the group of companies under Lopez Holdings Corporation (LHC), the listed flagship of the Lopez Group of Companies. First Philec was mandated by its parent to grow manufacturing into one of the core businesses of FPH.

Kandidat juga melamar untuk

  1. Home

Other Recommended Jobs

Apply jobs in

Job Categories:

Related to your search: