![Banner Image](http://s3-ap-southeast-1.amazonaws.com/kalibrr-static-assets/assets/shared/img/banners/Job-post--Default-Banner.png)
![Aboitiz Power Generation Group](https://rec-data.kalibrr.com/www.kalibrr.com/logos/VPGLT88LGUFUTCEX8RYN437VCYFKM4VDNKCCAP73-6103df4d.png)
Environmental Officer (PCO) | Project Based | Armenia, Tarlac
Aboitiz Power Generation Group
- Olongapo, PhilippinesOlongapo, Zambales, PhilippinesOlongapoZambalesPhilippinesPhilippines
- KontrakCONTRACTOR
Berakhir a month ago
2024-06-28T16:00:00+00:00Deskripsi Pekerjaan
The Environmental Specialist/PCO will be responsible for monitoring compliance of Armenia Solar Power Project. This position shall also provide technical and administrative support to both internal and external affairs of the Project Management Team and act as a resource environmental management. This position shall act as the Pollution Control Officer, with proper accreditation and expected to have a hand in hand support with the Occupational Safety and Health Officer of the project. This position shall promote environmental stewardship towards sustainable operations.
Kualifikasi Minimum
- Must be a Bachelor’s degree relevant to the job; Preferably a Graduate of Environmental Science, Environmental Engineering, Environmental Management or Chemical Engineering, Forestry
- With at least two (2) years prior experience as Environmental Officer
- Must be able to attain Pollution Control Officer accreditation within 1 year
- 1 vacant position available in Olongapo City, Zambales
Ringkasan Perkerjaan
- Tingkat Posisi
- Lulusan Baru / Junior
- Spesialisasi
- Sciences
- Persyaratan tingkat pendidikan
- Lulus program Sarjana (S1)
- Respon rekruter ke lamaran
- Once in a while
- Alamat Kantor
- Olongapo, Zambales, Philippines
Agar merasa aman saat melamar: carilah ikon verifikasi dan selalu lakukan riset terhadap Perusahaan yang Anda lamar. Hindari dan laporkan situasi dimana Perusahaan membutuhkan bayaran dalam proses rekrutmen mereka.