SN Aboitiz Power Group
SN Aboitiz Power Group

Variable Energy Engineer  

SN Aboitiz Power Group

 
  • Taguig, Philippines
    NAC Tower, 32nd Street, Bonifacio Global City, Taguig, Metro Manila, Philippines
    Taguig
    Metro Manila
    Philippines
    Philippines
  • Full timeFULL_TIME

Expired 5 years ago

2019-07-29T16:00:00+00:00
Job closed.

Job Description

Job Purpose

The principal function of this position is to be involved with site investigation, pre-screening/pre-feasibility and feasibility studies, and conceptual design of the greenfield development of solar and wind energy, energy storage system and emerging technology projects.

Accountability

Search for and evaluate solar and wind energy projects, energy storage system and other emerging energy technologies and make recommendations for further studies; scope out and manage studies by others; make recommendations as to which projects to drop and which to pursue.

Duties and Responsibilities

(General Tasks in achieving the accountabilities)

The responsibilities associated with this position include:

  • Collect, validate and synthesize secondary and primary technical data that are required for project screening, feasibility studies and conceptual design of solar and wind energy projects, energy storage system and other emerging energy technologies;
  • Design and layout the various power and non-power components, including access roads and other relevant structures for the project;
  • Design and implement site investigation programs for the various power and non-power components, including access roads and other relevant structures;
  • Provide technical support to external consultants and liaise with the local and international service providers and contractors;
  • Ensure project conformance to SNAP’s SHESQ protocols.
  • Participate in various screening, appraisal, and other field-based technical activities;
  • In coordination with the BDP team members, write screening, pre-feasibility and feasibility reports;
  • Coordinate the use of both internal and external technical resources to ensure completion of project deliverables.
  • Prepare scope of work/technical specification and bid/proposal evaluation;
  • Work with diverse teams of disciplines, including scientists/engineers, designers and drafters from project screening to pre-development works;
  • Prepare necessary technical documents for the DOE Renewable Energy Service Contract (RESC) application; and
  • Perform other duties as may be required by BDP senior management.

Minimum Qualifications

Skills: (Minimum requirements in terms of knowledge and skills)

  • Good understanding of solar and wind energy projects, energy storage system and other emerging energy technologies;
  • Basic geotechnical and geological skills which are required for design purposes;
  • Technical understanding of how solar and wind energy projects, energy storage system and other emerging energy technologies are screened, developed and structured;
  • Strong analysis and design skills;
  • Superior verbal and written communication and presentation skills;
  • Proven leadership, technical decision-making, and technical coaching skills;
  • Exceptional interpersonal skills and ability to lead and manage multi-disciplinary project teams in an open and collaborative team environment;
  • Excellent organization, planning and execution skills; and
  • Initiative, innovation, and commitment to technical excellence as well as with enthusiasm and drive toward long-term success.

Experience: (Minimum required experience)

  • 5-10 years’ experience in the design and construction of solar and wind energy projects, energy storage system and other emerging energy technologies, and preferably with Master’s degree in Engineering;
  • Broad knowledge of solar and wind energy projects, energy storage system and other emerging energy technologies and infrastructure projects and multi-disciplinary design and functional requirements, as well as with a comprehensive understanding of all phases of project development from concept through design and construction; and
  • Experience in the design, tendering, and construction of solar and wind energy projects, energy storage system and other emerging energy technologies and related structures and equipment is preferred.

Education: (Minimum required educational attainment)

  • Degree in Civil/Mechanical/Electrical/Energy Engineering or construction-related field, or equivalent construction-related work experience.

Jobs Summary

Job Level
Associate / Supervisor
Job Category
Architecture and Engineering
Educational Requirement
Bachelor's degree graduate
Recruiter response to application
Once in a while
Office Address
NAC Tower, 32nd Street, Bonifacio Global City
Industry
Oil / Energy / Solar / Greentech
Vacancy
1 opening
Website
http://www.snaboitiz.com

Feel secure when applying: look for the verified icon and always do your research on a company. Avoid and report situations when employers require payment or work without compensation as part of their application process.

About SN Aboitiz Power Group

WHO WE ARE SN Aboitiz Power Group or SNAP is the collective name of the power generation arm (SN Aboitiz Power-Magat, Inc. and SN Aboitiz Power-Benguet, Inc.) and power retailing arm (SN Aboitiz Power-RES, Inc.) of the business. Through its power generating unit, SNAP develops and operates world-class renewable energy facilities in the Philippines; and by means of its power retailing arm, SNAP provides innovative energy solutions to its customers. It is a recipient of several local awards and citations for its safety records, community programs, stakeholder relations, and environmental campaigns. It has also received international recognition in the Asian region for privatization and project financing as well as for its plants’ performance as independent power producers. With 641.5 MW of total capacity, SNAP harnesses the energy of flowing water to generate clean, renewable energy for its customers. WHAT WE DO Magat Hydro is one of the largest hydro facilities in Luzon, with a gross maximum capacity of 388 MW. It draws water from the Magat River through the multipurpose Magat Dam. Under the power restructuring law, the power facility was privatized in 2006. Following the successful bid of US$530 million, SNAP took over operations on April 26, 2007. The 8.5-MW Maris Hydro is the first power plant constructed by SNAP. Construction of the PHP2.5 billion run-of-river hydro plant took about two years—it broke ground in late 2015 and was completed in November 2017. Maris hydro utilizes water coming from Magat hydro. At its original capacity of 75 MW, Ambuklao Hydro was one of the first large hydroelectric power plants in the Philippines and is one of the oldest. In 2008, SNAP took over Ambuklao and the 100-MW Binga Plant after a winning bid of US$325 million under the privatization program. Ambuklao hydro re-operated in 2011 as a 105-MW power plant following its rehabilitation and upgrading. Binga Hydro was built in 1960 and lies 19 kilometers downstream of its sister facility, Ambuklao. It was bid out along with Ambuklao; but only the power components were privatized while the dams remain government-owned. Binga hydro underwent a refurbishment which began in 2010 and was completed in 2013. This increased the plant’s capacity from 100-125 MW. It is now capable of generating 140 MW after further uprating. With the advent of open access in the Philippines, customers with a monthly average peak demand of 750kW and above can choose a Retail Electricity Supplier through the Open Access market. SNAP-RES was formed into the group for the Retail Electricity Market. SNAP-RES continues to serve the needs of Contestable Customers by focusing on the requirements of each industry and delivering innovative solutions for each customer profile since 2011. SN Aboitiz Power (SNAP) is a joint venture of Scatec and Aboitiz Power Corporation (AP). Scatec is a Norway-based leading renewable power producer that delivers affordable and clean energy worldwide. As a long-term player, Scatec develops, builds, owns, and operates solar, wind, and hydropower plants and storage solutions. On the other hand, Aboitiz Power Corporation is a wholly-owned subsidiary representing the consolidated electricity interests of the Aboitiz Group—one of the largest conglomerates in the Philippines focusing on the electricity, financial, and food sectors. Aboitiz has been involved in the Philippine electricity industry since the 1930s.

People also applied to

  1. Home

Other Recommended Jobs

Apply jobs in

Job Categories:

Related to your search: